Reservoir Monitoring

 

At the end of December 2011, STREAM OIL&GAS Ltd had planned to apply the technique of hydraulic acid fracturing in the Well D-12 of the Delvina block, aiming to increase the well’s natural gas productivity rate.

In this context, Seismotech Geophysical Solutions was asked to monitor and analyze the possible microseismic activity on this area, related to the hydraulic fracturing works, by using a supplementary surface network of seismic stations.

This study was performed by Seismotech Geophysical Solutions as a side activity during the basic PST survey. 

 

 

 

 

 

 

 

 

 

Go to top